Perfection Couplings & Fittings
- 1/2" CTS
- 0.09 SDR/WALL
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 3/4" IPS
- SDR 11
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 3/4" IPS
- SDR 11
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1/2" CTS
- .090" SDR/WALL
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1" IPS
- SDR 11
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- Fast and easy installation, requires only one person
- No special tools or costly installation equipment
- No special training required to install
- Non-corrosive couplings eliminate need for protective coatings and cathodic protection
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1/2" CTS X 3/4" IPS
- .090" x SDR 11
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 3/4" IPS
- SDR 11
- 12" length
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 3/4" IPS x 3/4" IPS x 1/2" CTS
- SDR 11 X SDR 11 X 0.090"
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1" CTS
- 0.090"/.099"/.102" SDR/WALL
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1-1/4" IPS
- SDR 10
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1/2" CTS
- 0.09 SDR/WALL
- 12" length
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- Stop and go, both ends functional
- Cap can be removed by cutting on dotted line allowing the uncovered end to be stabbed onto a gas line
- 3/4" IPS
- SDR 11
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1/2" IPS
- SDR 9.3
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1-1/4" IPS X 3/4" IPS
- SDR 10 x SDR 11
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- Stop and go, both ends functional
- Cap can be removed by cutting on dotted line allowing the uncovered end to be stabbed onto a gas line
- 1/2" CTS
- 0.090" SDR/WALL
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 3/4" IPS
- SDR 11
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1/2" CTS
- 0.090" SDR/WALL
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1-1/4" IPS
- SDR 10
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1/2" IPS
- SDR 9.3
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1" IPS
- SDR 11
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- Stop and go, both ends functional
- Cap can be removed by cutting on dotted line allowing the uncovered end to be stabbed onto a gas line
- 1" IPS
- SDR 11
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES
- 1/2" CTS x 3/4" CTS x 1/2" CTS
- 0.0090" X .090" X 0.090"/.099"/.102" SDR/WALL
*MUST BE INSTALLED BY TRAINED PERSONNEL IN ACCORDANCE WITH NFPA 58 & 54 STATE AND LOCAL CODES